-
Frequently Asked Questions about Baymak Duotec Compact 24 Kw CombiChimney Included? Yes, all combi boiler group products include a chimney set consisting of elbow and chimney, shipped with the product.
-
Is this combi boiler with ERP? Yes, Baymak Duotec Compact 24 Kw model is a new generation ErP (Energy Compatible Product) pump.
-
Is Underfloor Heating Suitable? Yes, you just need to specify it during the first opening of the service.
-
Shipping included? Yes, shipping is included in our prices for all combi boiler purchases.
-
Information on Combi Boiler Assembly and warranty procedures is at the bottom of the page.
-
Baymak Duotec Compact 24 Full Condensing Combi• 24 to 30 kw heating capacity • Full savings with Premix full condensation technology • ErP Energy efficiency class A • Space saving thanks to compact dimensions • Modulating circulation pump • Combustion group with cold burner door technology • Full protection against freezing in the heating and domestic water circuit • NOx class 6 • Hydraulic group made of brass material • Comfortable heating with combustion chamber and stainless coiled heat exchanger with Premix technology • Suitable for burning natural gas with stainless cylindrical steel burner • Domestic water heat exchanger with stainless steel plates • Pump and 3-way valve blocking protection • Fault code display • Quiet operationMain Duotec Compact 24 Full Condensing Combi Boiler Assembly and Warranty Operations- After your boiler reaches you, you need to get installation services from the plumber persons or companies around you for a fee.
-
Authorized services DO NOT PROVIDE assembly services.
-
In condensing boilers, there must be sewage drainage near the installation site.
-
After installing your boiler, you can call Baymak Customer Service on +90444 02 35 and request an appointment for the start of commissioning and warranty.
-
5 situations must be ready when the authorized service arrives:1- The boiler must be installed2- The electrical connection with 2 amps fuse pulled up to the side of the boiler must be made3- Water must be given to the heating cores or the installation after the boiler installation4- DEVICE CHANGE approval certificate or GAS CONFORMITY certificate obtained from the natural GAS distribution company5- The boiler condensate must be connected to a drain connected to the manhole.


