-
Frequently Asked Questions about Daikin NDJ D2CND024 24 kW CombiChimney Included? Yes, all combi boiler group products include a chimney set consisting of elbow and chimney, shipped with the product.
-
Is this combi boiler with ERP? Yes, Daikin NDJ D2CND024 24 kW model is a new generation ErP (Energy Compatible Product) pump.
-
Is Underfloor Heating Suitable? No, it is not compatible with underfloor heating as it has an aluminum heat exchanger.
-
Shipping included? Yes, shipping is included in our prices for all combi boiler purchases.
-
Information on Combi Boiler Assembly and warranty procedures is at the bottom of the page.
-
Daikin Premix NDJ D2CND024 Full Condensing Combi Boiler - Experience the difference of 24 kW (20.640 kCal/h)Japanese technology with the Daikin Combi Boiler.
-
Full Condensing Heat Exchanger designed with Daikin technology and R&D power Daikin Premix NDJ › › Condensing boiler with a capacity of 24, 28, 35 kW › › High efficiency 109% › › Europe's smallest boiler with a volume of 0.06 m3 (for 24 kW boiler Model) › › hafif boiler with a weight of 27 kg (for 24 kW boiler Model) › › Silent boiler (Sound power 49 db, sound pressure 39 db) › › Daikin special design main exchanger › › Stainless steel plate heat exchanger › › Premix combustion and full condensing technology › › Safe combustion technology with automatic gas adaptation › › 1/8 wide modulation range › Frequency controlled, energy efficient circulation pump › › Easy to use, high resolution LED display › › Thermo regulation › › Brass hydraulic group › › › Environmentally friendly › › › A Energy classDaikin NDJ D2CND024 24 kW Full Condensing Combustion Assembly and Warranties - After your combustion is reached, you need to get installation service from the people or companies around you.
-
Authorized services DO NOT PROVIDE assembly services.
-
In condensing boilers, there must be sewage drainage near the installation site.
-
After installing your boiler, you can call +90444 99 90 Daikin Customer Service and request an appointment for the start of commissioning and warranty.
-
5 situations must be ready when the authorized service arrives:1- The boiler must be installed2- The electrical connection with 2 amps fuse pulled up to the side of the boiler must be made3- Water must be given to the heating cores or the installation after the boiler installation4- DEVICE CHANGE approval certificate or GAS CONFORMITY certificate obtained from the natural GAS distribution company5- The boiler condensate must be connected to a drain connected to the manhole.


